standards
Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist) B30.18 - 2016

Format Member Price List Price Availability Order No. Qty
Print-Book $53.00 $53.00 Ships in 3-5 Days J11316 Add to cart
Digital Book $53.00 $53.00 Immediately J1131T
1
Add to cart

Important information regarding ASME PDFs

Description

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

Table of Contents

Online Order Form

  • Publisher: ASME
  • Publish Date: 2016
  • Pages: 40
  • Language: English
  • ISBN: 9780791871140
Sign up to receive email notifications when updates to this publication are available.

Digital PDFs are a single-user product with a license granted by ASME for personal use only.

Digital PDFs are encrypted and require both the Acrobat plug-in and the FileOpen Acrobat plug-in.

Final invoices will include applicable sales and use tax.
left column